Weekly Road Work Report from Texas Department of Transportation
Here is the Weekly Road Work Report from TxDOT for September 2-8.
Bowie County
US 259 – At Red River north of De Kalb, constructing new bridge.
US 67 – At Bassett Creek, upgrading guard rail on bridge. Alternating one-way traffic across bridge controlled by signal lights.
US 67 – From FM 989 to FM 2148 North, resurfacing highway.
Camp County
None
Cass County
SH 77 – From US 59 in Atlanta to SH 8 in Douglassville, resurfacing highway.
FM 3129 – From US 59 to SH 77, upgrading guard rails and adding safety features to drainage structures.
Harrison County
Loop 281– at I-20 overpass, conducting preventative maintenance work on overpass.
SH 43 – at I-20 overpass, conducting preventative maintenance work on overpass.
Marion County
None
Morris County
None
Panola County
SH 149 – At SH 315, constructing overpass and widening highway.
US 59 – From Harrison County Line to FM 2792, repairing pavement and resurfacing highway.
FM 699 – At FM 2517, reconstructing intersection.
Titus County
US 271 – From end of freeway section of US 271 to 0.3 mile south of FM 3417, extending freeway lanes and constructing overpass at FM 3417.
US 271 – At Ripley Creek and Ripley Creek Relief, replacing bridges.
FM 3417 – From US 271 to FM 127, widening highway.
Upshur County
None